Skip to content
Nominal FR Let's talk about your project
Home/Approach

From analysis to implementation.

Every engagement follows the same thread, whether it lasts a week or several months. What changes is the mode of intervention: advising leadership, leading the programme, or taking the controls for as long as needed.

  1. Phase00

    First conversation.

    One hour, by video call or at your premises. You set out the context and the stakes, Nominal asks the questions that allow the scope to be defined. If the engagement is not right for Nominal, you know straight away.

    • →
      You receiveA short proposal: the understanding of the need, the scope, the mode of intervention and the timetable.
  2. Phase01

    Analyse, on the ground.

    Interviews with leadership, managers and those who do the work, separately. Observation of real flows, reading of documents, figures and tools. Each person is right about their part of the facts: the analysis puts them end to end.

    “What do you work around every day to make things work?”

  3. Phase02

    Design the target model.

    The organisation, processes, roles and systems, as they should be to hold the intended state. Several options, with their effort, their risks and their effects on the teams.

    Flow map

    Sample

    The work as it is really done, from request to invoice. Here, everything waits for a single signature.

    Who decides what

    Sample
    DecisionLeadershipManagerTeamHR
    Plan the weekIDF
    Arbitrate an emergencyDDF
    RecruitIDF
    Approve an expenseDF
    D decidesF doesI informed

    One row in amber: two people decide the same thing, so in effect nobody does.

  4. Phase03

    Decide, across three horizons.

    Leadership arbitrates between the options. The roadmap that results fits on a page: what is done straight away, what is installed within three months, what must hold in a year, and who owns each workstream.

    Three-horizon plan

    Sample
    Straight away
    • A single person approves
    • Team check-in on Monday, 20 min
    • Emergencies in a single channel
    Three months
    • Roles written down and shared
    • Four figures tracked every week
    • The request process simplified
    One year
    • A deputy trained
    • Tools reset
    • Steering holds without me

    What is done now, what comes next, and what must hold in a year.

  5. Phase04

    Implement, in the right mode.

    Depending on the scale of the change and your internal resources. It is possible to move from one mode to another along the way.

    AdvisoryLeadership leadsPreparing decisions, review, presence at key moments, support for managers.
    Programme managementNominal steersGovernance, milestones, risks, suppliers and change management, alongside the sponsor.
    Interim managementNominal leadsTaking up the post on site, for as long as needed to stabilise, decide and hand over.
  6. Phase05

    Embed the nominal state.

    A change that holds only as long as the consultant is there has not succeeded. A few indicators tracked every week, autonomous managers, a documented handover. Then Nominal steps back.

    Steering dashboard

    Sample
    NominalLead times met
    DriftThis week's emergencies
    NominalRework and returns
    NominalTeam workload

    Few figures, looked at every week, early enough to decide. The one that drifts is seen immediately.

Commitments

Four rules, on every engagement.

  • 01A single point of contactThe person who scopes the engagement is the one who leads it. No handover to a junior.
  • 02The ground firstLeadership and teams are heard, separately. Facts before opinions.
  • 03Say what is soEven when it is uncomfortable. That is the value of an outside view.
  • 04Leave autonomy behindTeams and tools that hold without Nominal. The systems delivered belong to the client.
Phase 00

Shall we begin with an hour?

Request a first conversation